Organisational

__________________________________________________________________________________

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

_______________

FORM 6-K

REPORT OF FOREIGN ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16 OF

THE SECURITIES EXCHANGE ACT OF 1934

For the Date of 16 June 2003

BHP Billiton Limited

ABN 49 004 028 077

600 Bourke Street

Melbourne Victoria 3000

Australia

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

 

Form 20-F X   Form 40-F  

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934

 

Yes     No X

If "Yes" is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b):


Date 16 June 2003
Number 21/03

BHP BILLITON APPROVES ESCONDIDA NORTE COPPER PROJECT


BHP Billiton and its partners have approved the development of the Escondida Norte copper project in northern Chile, as part of Escondida's operating strategy to maintain copper production capacity in future years.

Brad Mills, President and CEO of BHP Billiton Base Metals said that the Escondida Norte open pit would be located 5 km from the existing Escondida mining operations. Escondida Norte will mine a satellite ore body that will be able to provide higher-grade copper ore to the two existing Escondida concentrators, which will also continue to receive ore from the Escondida mine.

"Due to the proximity of the Norte open pit to the Escondida operations, we can develop this property in a manner that maximizes the synergies with the existing Escondida infrastructure. Norte will provide the necessary feed to maintain capacity at Escondida above 1.2 million tonnes per annum of copper in concentrate and cathode
through the end of 2008," Mr Mills said.

Ore grades at the existing Escondida mine are forecast to continue to decline over the next several years. Norte will enable Escondida to maintain existing capacity. The development of the Norte open pit will increase production flexibility and reduce operational risks associated with a single mine source, as well as further reduce the cost of production from an already low base. First copper production from the Norte open pit is scheduled for the fourth quarter of CY2005.

Development costs are estimated at US$400 million (BHP Billiton share US$230 million). These costs include installation of a primary crusher, construction of an overland conveyor, maintenance and operating support facilities, some new mining equipment, the transition of a portion of the current Escondida mobile equipment fleet to the Norte open pit and waste pre-stripping of the new pit. Escondida Norte's combined proved and probable ore reserves are estimated at 526 million tonnes of sulphide ore at an average copper grade of 1.42% and a cut-off grade of 0.7%, giving an ore reserve life of approximately 17 years.


The information in this report that relates to Ore Reserves is based on information compiled by Dr Jonathan M. Gilligan Ph.D., B.Sc. (Hons), FGS, MAusIMM, who is a Member of the Australian Institute of Mining and Metallurgy and is a full time employee of Minera Escondida Ltda. Dr Gilligan has sufficient experience, which is relevant to the style and type of deposit and to the activity that he is undertaking to qualify as a Competent Person as defined in the 1999 edition of the "Australasian Code for Reporting of Minerals Resources and Ore Reserve". The Competent Person consents to the inclusion in this report of the matters based on their information in the form and context in which they appear.

****

Further information can be found on our Internet site: http://www.bhpbilliton.com

 

Australia
Andrew Nairn, Investor Relations
Tel: +61 3 9609 3952 Mobile: +61 408 313 259
email: Andrew.W.Nairn@bhpbilliton.com

United Kingdom
Mark Lidiard, Investor & Media Relations
Tel: +44 20 7802 4156
email: Mark.Lidiard@bhpbilliton.com

Tania Price,  Media Relations
Tel: +61 3 9609 3815 Mobile: +61 419 152 780
email: Tania.Price@bhpbilliton.com

Ariane Gentil, Media Relations
Tel: +44 20 7802 4177
email: Ariane.Gentil@bhpbilliton.com

United States
Francis McAllister, Investor Relations
Tel: +1 713 961 8625 Mobile: +1 713 480 3699
email: Francis.R.McAllister@bhpbilliton.com

South Africa
Michael Campbell, Investor & Media Relations
Tel: +27 11 376 3360 Mobile: +27 82 458 2587
email: Michael.J.Campbell@bhpbilliton.com

 

BHP Billiton Limited ABN 49 004 028 077
Registered in Australia
Registered Office: 600 Bourke Street Melbourne Victoria 3000
Telephone +61 3 9609 3333 Facsimile +61 3 9609 3015

BHP Billiton Plc Registration number 3196209
Registered in England and Wales
Registered Office: Neathouse Place London SW1V 1BH United Kingdom
Telephone +44 20 7802 4000 Facsimile +44 20 7802 4111

The BHP Billiton Group is headquartered in Australia

__________________________________________________________________________________________

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

BHP BILLITON LIMITED
/s/ KAREN WOOD
_____________________

Karen Wood
Title: Company Secretary
Date: 16 June 2003