For the Date of 16 June 2003
BHP Billiton Limited
ABN 49 004 028 077
600 Bourke Street
Melbourne Victoria 3000
Australia
Indicate by check mark whether the registrant files or will file annual
reports under cover of Form 20-F or Form 40-F.
Form 20-F | X | Form 40-F |
Indicate by check mark whether the registrant by furnishing the information
contained in this Form is also thereby furnishing the information to the
Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934
Yes | No | X |
If "Yes" is marked, indicate below the file number assigned to the
registrant in connection with Rule 12g3-2(b):
Date
16 June 2003BHP BILLITON APPROVES ESCONDIDA NORTE COPPER PROJECT
BHP Billiton and its partners have approved the development of the Escondida Norte copper project in northern Chile, as part of Escondida's operating strategy to maintain copper production capacity in future years.
Brad Mills, President and CEO of BHP Billiton Base Metals said that the Escondida Norte open pit would be located 5 km from the existing Escondida mining operations. Escondida Norte will mine a satellite ore body that will be able to provide higher-grade copper ore to the two existing Escondida concentrators, which will also continue to receive ore from the Escondida mine.
"Due to the proximity of the Norte open pit to the Escondida operations, we can develop this property in a manner that maximizes the synergies with the existing Escondida infrastructure. Norte will provide the necessary feed to maintain capacity at Escondida above 1.2 million tonnes per annum of copper in concentrate and cathode
Development costs are estimated at US$400 million (BHP Billiton share US$230 million). These costs include installation of a primary crusher, construction of an overland conveyor, maintenance and operating support facilities, some new mining equipment, the transition of a portion of the current Escondida mobile equipment fleet to the Norte open pit and waste pre-stripping of the new pit. Escondida Norte's combined proved and probable ore reserves are estimated at 526 million tonnes of sulphide ore at an average copper grade of 1.42% and a cut-off grade of 0.7%, giving an ore reserve life of approximately 17 years.
****
Further information can be found on our Internet site: http://www.bhpbilliton.com
Australia Tel: +61 3 9609 3952 Mobile: +61 408 313 259 email: Andrew.W.Nairn@bhpbilliton.com |
United Kingdom Tel: +44 20 7802 4156 email: Mark.Lidiard@bhpbilliton.com |
Tania Price, Media Relations |
Ariane Gentil, Media Relations |
United States Tel: +1 713 961 8625 Mobile: +1 713 480 3699 email: Francis.R.McAllister@bhpbilliton.com |
South Africa Michael Campbell, Investor & Media Relations Tel: +27 11 376 3360 Mobile: +27 82 458 2587 email: Michael.J.Campbell@bhpbilliton.com |
BHP Billiton Limited ABN 49 004 028 077 Registered Office: 600 Bourke Street Melbourne Victoria 3000 Telephone +61 3 9609 3333 Facsimile +61 3 9609 3015 |
BHP Billiton Plc Registration number 3196209 Registered Office: Neathouse Place London SW1V 1BH United Kingdom Telephone +44 20 7802 4000 Facsimile +44 20 7802 4111 |
The BHP Billiton Group is headquartered in Australia
__________________________________________________________________________________________
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
BHP BILLITON LIMITED
/s/ KAREN WOOD
_____________________
Karen Wood
Title: Company Secretary
Date: 16 June 2003