UNITED STATES
SECURITIES AND EXCHANGE
COMMISSION
Washington, D.C. 20549
_________________
FORM 8-K
CURRENT REPORT
Pursuant to Section 13
or 15(d) of
the Securities Exchange
Act of 1934
_________________
Date of Report | ||
(Date of earliest | ||
event reported): | September 8, 2008 |
Commission | Name of Registrant, State of Incorporation, Address of | IRS Employer |
File Number | Principal Executive Offices and Telephone Number | Identification Number |
1-9894 |
Alliant Energy Corporation | 39-1380265 |
(a Wisconsin corporation) | ||
4902 N. Biltmore Lane | ||
Madison, Wisconsin 53718 | ||
Telephone (608) 458-3311 | ||
0-4117-1 |
Interstate Power and Light Company | 42-0331370 |
(an Iowa corporation) | ||
Alliant Energy Tower | ||
Cedar Rapids, Iowa 52401 | ||
Telephone (319) 786-4411 | ||
0-337 |
Wisconsin Power and Light Company | 39-0714890 |
(a Wisconsin corporation) | ||
4902 N. Biltmore Lane | ||
Madison, Wisconsin 53718 | ||
Telephone (608) 458-3311 |
This combined Form 8-K is separately filed by Alliant Energy Corporation, Interstate Power and Light Company and Wisconsin Power and Light Company.
_________________
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:
[ ] | Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425) |
[ ] | Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12) |
[ ] | Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b)) |
[ ] | Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c)) |
Item 8.01. | Other Events. |
As part of rebuttal testimony filed on September 8, 2008 with the Public Service Commission of Wisconsin, Wisconsin Power and Light Company (WPL), a wholly owned subsidiary of Alliant Energy Corporation, is updating WPLs cost estimate for capital expenditures for its proposed addition of a new third unit of the Nelson Dewey Generating Station in Cassville, Wisconsin to an estimated range of $1.2 billion to $1.3 billion, which is an increase from the previously disclosed range of $1.1 billion to $1.2 billion. Primary drivers of the increase are escalations of major equipment costs and subsistence costs to attract labor. Cost estimates represent WPLs total escalated construction expenditures and exclude allowance for funds used during construction, if applicable.
Separately, the Iowa Utilities Board (IUB) recently changed the start of technical hearings on the ratemaking principles docket associated with Interstate Power and Light Companys (IPL), a wholly owned subsidiary of Alliant Energy Corporation, proposed addition of a new unit at the Sutherland Generating Station in Marshalltown, Iowa from September 15, 2008 to October 6, 2008. IPL plans to respond to the IUBs order requiring additional information on the docket by September 12, 2008.
This Current Report on Form 8-K includes forward-looking statements. These forward-looking statements can be identified as such because the statements include words such as estimate, estimated, plans or other words of similar import. Similarly, statements that describe future plans or strategies are also forward-looking statements. Such statements are subject to certain risks and uncertainties that could cause actual results to differ materially from those currently anticipated. Actual results could be affected by such factors as: state regulatory actions or local government actions which delay, prevent or alter the proposed plans, including inability to obtain all necessary approvals and permits; unanticipated construction issues, delays or expenditures including increased costs of labor, materials and equipment; failure of equipment and technology to perform as expected; current or future litigation, regulatory investigations, proceedings or inquiries that could impede the implementation of WPLs and IPLs plans; political conditions in WPLs and IPLs service territories; changes to WPLs and IPLs access to capital markets; and economic conditions in WPLs and IPLs service territory. These factors should be considered when evaluating the forward-looking statements and undue reliance should not be placed on such statements. The forward-looking statements included herein are made as of the date hereof and Alliant Energy, IPL and WPL undertake no obligation to update publicly such statements to reflect subsequent events or circumstances.
2
Pursuant to the requirements of the Securities Exchange Act of 1934, Alliant Energy Corporation, Interstate Power and Light Company and Wisconsin Power and Light Company have each duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
ALLIANT ENERGY CORPORATION | |
Date: September 8, 2008 |
By: /s/ Barbara J. Swan |
Barbara J. Swan | |
Executive Vice President and | |
General Counsel | |
INTERSTATE POWER AND LIGHT COMPANY | |
Date: September 8, 2008 |
By: /s/ Barbara J. Swan |
Barbara J. Swan | |
Executive Vice President and | |
General Counsel | |
WISCONSIN POWER AND LIGHT COMPANY | |
Date: September 8, 2008 |
By: /s/ Barbara J. Swan |
Barbara J. Swan | |
President |
3