For Immediate Release
Lishui 36-1 Gas Field Starts Production
(Hong Kong, July 29, 2014) - CNOOC Limited (the “Company”, NYSE: CEO, SEHK: 00883, TSX: CNU) announced today that the Lishui 36-1 gas field has commenced production.
Lishui 36-1 gas field is located 150 kilometres away from Wenzhou city Zhejiang province, with an average water depth of approximately 84 meters. The gas field has 4 producing wells, and its primary production facilities include a comprehensive platform and a processing terminal.
CNOOC Limited has 51% working interest in Lishui 36-1 gas field and acts as the operator, while its partners, Primeline Energy China Limited and Primeline Petroleum Corporation, hold the remaining 36.75% and 12.25% working interest, respectively.
– End –
Notes to Editors:
More information about the Company is available at http://www.cnoocltd.com.
*** *** *** ***
This press release includes “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995, including statements regarding expected future events, business prospectus or financial results. The words “expect”, “anticipate”, “continue”, “estimate”, “objective”, “ongoing”, “may”, “will”, “project”, “should”, “believe”, “plans”, “intends” and similar expressions are intended to identify such forward-looking statements. These statements are based on assumptions and analyses made by the Company in light of its experience and its perception of historical trends, current conditions and expected future developments, as well as other factors the Company believes are appropriate under the circumstances. However, whether actual results and developments will meet the expectations and predictions of the Company depends on a number of risks and uncertainties which could cause the actual results, performance and financial condition to differ materially from the Company’s expectations, including those associated with fluctuations in crude oil and natural gas prices, the exploration or
development activities, the capital expenditure requirements, the business strategy, whether the transactions entered into by the Group can complete on schedule pursuant to its terms and timetable or at all, the highly competitive nature of the oil and natural gas industries, the foreign operations, environmental liabilities and compliance requirements, and economic and political conditions in the People’s Republic of China. For a description of these and other risks and uncertainties, please see the documents the Company files from time to time with the United States Securities and Exchange Commission, including the 2013 Annual Report on Form 20-F filed on 17 April 2014.
Consequently, all of the forward-looking statements made in this press release are qualified by these cautionary statements. The Company cannot assure that the results or developments anticipated will be realised or, even if substantially realised, that they will have the expected effect on the Company, its business or operations.
*** *** *** ***
For further enquiries, please contact:
Ms. Michelle Zhang
Deputy Manager, Media / Public Relations
CNOOC Limited
Tel: +86-10-8452-6642
Fax: +86-10-8452-1441
E-mail: MR@cnooc.com.cn
Ms. Cathy Zhang
Hill+Knowlton Strategies Asia
Tel: +852-2894 6211
Fax: +852-2576 1990
E-mail: cathy.zhang@hkstrategies.com