Preliminary Proxy Statement | |
¨
|
Confidential, for Use of the Commission Only (as permitted by Rule 14a-6(e)(2)) | |
¨
|
Definitive Proxy Statement | |
¨
|
Definitive Additional Materials | |
ý
|
Soliciting Material Pursuant to § 240.14a-12 |
ý | No fee required. | |||||
¨ | Fee computed on table below per Exchange Act Rules 14(a)-6(i)(4) and 0-11. | |||||
(1 | ) | Title of each class of securities to which transaction applies: | ||||
(2 | ) | Aggregate number of securities to which transaction applies: | ||||
(3 | ) | Per unit price or other underlying value of transaction computed pursuant to Exchange Act Rule 011 (set forth the amount on which the filing fee is calculated and state how it was determined): | ||||
(4 | ) | Proposed maximum aggregate value of transaction: | ||||
(5 | ) | Total fee paid: | ||||
¨ | Fee paid previously with preliminary materials. | |||||
¨ | Check box if any part of the fee is offset as provided by Exchange Act Rule 0-11(a)(2) and identify the filing for which the offsetting fee was paid previously. Identify the previous filing by registration statement number, or the Form or Schedule and the date of its filing. | |||||
(1 | ) | Amount Previously Paid: | ||||
(2 | ) | Form, Schedule or Registration Statement No.: | ||||
(3 | ) | Filing Party: | ||||
(4 | ) | Date Filed | ||||
Fact Sheet August 2007 PALMAREJO SILVER and GOLD PROJECT |
Located in Chihuahua, Mexico in the Sierra Madre Occidental mineral belt Plus two additional exploration properties in the belt Approx 1.5 hours air from Chihuahua 25 km from town of Temoris. PALMAREJO PROJECT LOCATION |
PALMAREJO PROJECT MANAGEMENT During Transition At close of Due Diligence period two new committees formed to manage project during transition period: Site based Project Development Committee consisting of senior site managers from each company Corporate based Steering Committee consisting of Directors, Chairman from BSG, PJO and CDE Post Closing Appointment of GM-VP Palmarejo (Stuart Mathews) Buildup of operational management team including: Continued, focused exploration in the Palmarejo district managed by Coeur corporate Exploration |
Million Tonnes Grades Grades Contained Metals Contained Metals Contained Metals Million Tonnes Au (g/t) Ag (g/t) Au (koz) Ag (Moz) Ag (Moz) Palmarejo Project (August 2007) Palmarejo Project (August 2007) Palmarejo Project (August 2007) Palmarejo Project (August 2007) Palmarejo Project (August 2007) Palmarejo Project (August 2007) Palmarejo Project (August 2007) Measured 5.4 2.22 200 384 384 34.6 Indicated 9.1 2.00 186 587 587 54.7 Inferred 4.0 1.31 138 169 169 17.9 Guadalupe (August 2007) Guadalupe (August 2007) Guadalupe (August 2007) Guadalupe (August 2007) Guadalupe (August 2007) Guadalupe (August 2007) Guadalupe (August 2007) Inferred 5.7 0.83 106 155 155 19.6 La Patria (March 2007) La Patria (March 2007) La Patria (March 2007) La Patria (March 2007) La Patria (March 2007) La Patria (March 2007) La Patria (March 2007) Inferred 3.6 1.49 35 171 171 4.0 Total 27.8 1.64 146 1,466 1,466 130.8 Source: PJO filing s on www.sedar.com *Based on 0.80 AuEq Cut-off Grade; Au Eg grams/tonne = Au grade + (Ag grade/55) PALMAREJO DISTRICT MINERAL RESOURCES - Current |
MINERAL RESOURCE ESTIMATION Based on detailed compilation from plans and sections by independent Qualified Person for PJO and BSG. Mine Development Associates (Reno, NV) has prepared all NI43-101 Technical Reports Drilling: over 140,000 meters of core and reverse circulation drilling on the project. Drilling continues today Grade continuity established on 20 to 40m cross sections Historic Mining modeled by MDA and BSG. Geology Database: Regular analytical and data base QAQC procedures External, independent auditing used by PJO and BSG |
Epithermal silver and gold bearing veins and breccias Mineralogy... Pyrite-argentite-electrum +- sphalerite, galena, chalcopyyrit, hematite, rhodocrosite Best veins in ... Lower volcanic series (LVS) andesite and lesser sediments Structural setting... Vein systems define NW trending graben. Palmarejo is on the NE side while Guadalup and La Patria are on the SW side. GEOLOGY |
Palmarejo Trend Long NW-SE structure Dips SW Multiple ores shoots (clavos) Guadalupe Trend Long NW-SE structure Dips NE Multiple clavos La Patria Trend Higher Au:Ag Near surface potential (+200m) GEOLOGY and EXPLORATION |
PALMAREJO AREA GEOLOGY |
PALMAREJO AREA CROSS SECTION |
METALLURGY AND PROCESSING Metallurgy test work: Comprehensive & professional by multiple independent sources Recovery: Test work results are 93.8% Au / 91.7% Ag Flotation & Carbon-in-Leach (CIL) process: Appropriate methodology Plant & Tailings Infrastructure Location: Controlled by topography & spatial constraints. Design engineering well-advanced. Tails Dam Options still under consideration SAG & Ball Mills: Purchased & in transit. Approx 2.5 Mta capacity. Flotation Cells, Pumps, Cyclones,Thickeners, Agitators, Power Generators - All purchased or on-order Tailings Dam: Approved by Mexican authorities. Quality consultants used for geotechnical & design parameters. Additional water management design required. Water: Sourced from adjacent to Chinipas River & site Storage facility (1 Mill m3 capacity - under review). Pump-back from tailings Dam likely, & water dam facility under consideration Plant Foundations: Well advanced & structurally competent Capital Cost: Revised 2007 to YE 2008 = US$202 Mill |
PROCESS PLAN SCHEMATIC (per BSG/PJO) |
PROJECT DEVELOPMENT Coeur is evaluating its preferred combined open pit and underground mine plan Based on its extensive mining experience, Coeur believes that this approach will optimise production at the Palmarejo Project, delivering a wide range of opportunities: Extended mine life Reduced strip ratio Access higher grade materials earlier Flexibility to change target mining areas as new information becomes available Reduced environmental risk with less waste produced and single tailings dam Joint Coeur-Bolnisi-Palmarejo Project Development Committee ('PDC') established to oversee project development until transaction close. |
STRATEGIC VALUE TO COEUR Quality, high-grade Mineral Resource Compelling fit to Coeur's global mining and processing experience. Good exploration potential on remaining tenement package Spread of sovereign risk & mine project risk A production position in Mexico in support of our current and future exploration Good regulatory & permitting climate in Mexico A foundation for future Company growth |